Case Studies
Ultra Pure Chemical Dispense Modules
CPS was contracted to design, fabricate, install and commission Ultra Pure Chemical Dispense modules for a major new Electronics facility in Germany.
Seven units were designed and installed to handle a range of Acids, Alkali’s and ...
Bulk Storage Installation
CPS was awarded the contract to supply new Spiral Wound HDPE bulk storage vessels for a large pigments manufacturer.
The contract involved the supply, fabrication and installation of new 34m3 Sodium Hydrogen sulphide and 30m3 Sodiu ...
GRP Tank Failure
CPS was contacted by a large waste treatment company after the catastrophic failure of a grp tank had caused major damage and halted production at the plant. The initial tank failure led to the failure of a second grp tank and compromised the integrity of the existing ...
Rutherford Appleton Laboratories
The new Research Complex at Harwell Oxford is a multidisciplinary laboratory providing world leading facilities for new and cutting edge research in both life and physical sciences and the interface between them.
Environmental issues ...
New Inspection Facility
CPS was awarded the contract to design and build a new inspection facility for a specialist alloy manufacturer.
The contract included the design and construction of a new production building, electrics and processing equipment. ...